15
Step 2
Mark positions for drilling holes with a marker.
Step 3
Drill the holes with a drill according to the marked positions.
Avoid drilling holes in the utility pipes and/or cables attached to back of the wall!
Operation personnel should wear goggles and dust mask throughout the drilling
process to avoid dust inhalation or contact with eyes.
Step 4
Secure the expansion bolts into the holes with a rubber mallet.
If the Logger1000 is installed onto the metal surface, skip performing this step.
Step 5
Fix the screw or bolt on the installation surface, where the screw protrudes from the wall
surface by about 5mm.Hang the Logger1000 onto the screws on the concrete wall or
metal surface via the wall-mounting holes on the back of Logger1000.
User Manual