32
8
Commissioning
8.1
Inspection before Commissioning
N
No
o..
IIn
nssp
pe
ec
cttiio
on
n iitte
em
m
R
Re
essu
ulltt
1
All cables are intact, well-insulated, and appropriately
dimensioned
□
2
All cables are connected correctly and firmly
□
3
The polarity of the power supply cable is correct. The
grounding cable is reliably grounded
□
8.2
Commissioning Steps
N
No
o..
S
Stte
ep
p
R
Re
essu
ulltt
1
Inspection before commissioning
□
2
Power on the Logger1000.
□
3
Check whether the indicators of Logger1000 normally flash.
□
4
Connect the debugging PC to the "ETH" port of the
Logger1000 via the network cable (default IP address of
"ETH": 12.12.12.12).
Log in the Web at 12.12.12.12 through the IE, Safari or
Chrome browser.
□
5
Make sure the communication cable connecting the device
and the Logger1000 is firmly in place, and connect the DC
circuit breaker of the inverter to ensure the inverter is
supplied with power.
□
6
Set serial port parameters by referring to the
chapter, including the baud rate, check bit, data bit,
and stop bit.
The default setting is 9600bps, 8 data bit, 2 stop bit, and no
check bit.
□