System Manual
25
5.3.4 Other Precautions
A drainage system should be designed on the installation site to prevent the MV Station
from being immersed in water during heavy rainfalls.
Do not plant any trees near the MV Station installation site to prevent the damage of the
MV Station caused by tree leaves or stems.
5.4
Securing the MV Station(optional)
Overview
As shown by A in the figure below, the position for installing L-shape angle steel is reserved
at the bottom of the container.
A
A
A
A
The number of L-shape angle steel shown in the figure above is for reference
only, and it can be adjusted according to onsite conditions.
Preparing Installation Tools
The following tools may be used in installing the L-shape angle steel:
No.
Name
Resource
1
Marker
Beyond the scope of delivery
2
φ22 percussion drill
Beyond the scope of delivery
3
Angle steel
In the scope of delivery
4*
M16×150 expansion bolts
In the scope of delivery
5**
M16×50/
M12x35 screw
In the scope of delivery
* The bolt specification is for reference only. Select appropriate bolts according to onsite
conditions.
Summary of Contents for MVS6250
Page 2: ......