System Manual
30
Sand and moisture penetration may affect the performance of electric devices inside the
MV Station!
Do not perform electrical connection in sandy season or when the ambient relative
humidity is above 95%.
Perform electrical connection on fine weather days.
Improper torque used may cause a fire to the connection point!
Fix the bolts by strictly following the torque requirements in this manual during electrical
connection.
Too small bending radius or excessive intertwine may damage the fiber!
When selecting fiber as the communication cable, please follow the related requirements
of the fiber manufacturer about the min. allowable bending radius.
Only professional electricians can perform the electrical connection. Professional
electricians should meet the related requirements listed in "2 Safety Instructions" in this
manual. Sungrow should hold no liability for any personal injury or property loss caused
by ignorance of the safety instructions.
Ensure the electrical insulation is satisfied before laying the cables. Follow the EMC
regulation and lay the power cable and communication cable in different layers. Provide
support and protection to the cables to reduce the stress of the cables when necessary.
Strictly follow all the instructions when connecting the cables.
Summary of Contents for MVS6250
Page 2: ......