1 Installation
Quick User Manual
4
Second PE Connection
Item
Description
Specification
A Cable
socket
-
B Washer
-
C Spring
washer
-
D Screw
M5 x 12 mm (3.0 N
m)
E Yellow-green
cable
6–10 mm
2
copper wire or 10–16 mm
2
aluminum
wire
1.4
Installing the Meter
The SUNGROW meter should be installed next to the main switch. It supports a 35
mm DIN-rail installation, as shown in the following figure.
Fig. 1-2
Installing the Energy Meter to the Rail
The single-phase Energy Meter and the three-phase Energy Meter are
alternative in the delivery. The meter figures in this document have been
created for the three-phase Energy Meter unless otherwise specified.