3 Commissioning
Quick User Manual
22
Fig. 3-3
Correct Installation and Connection of the Single-phase Meter
* The CT clamp of 1-phase sensor can be placed before or after the main switch.
The following figure shows the correct installation and connection of the
three-phase meter.
Fig. 3-4
Correct Installation and Connection of the Three-phase Meter
Before the verification, disconnect the DC switch between the inverter and the
battery module.
Summary of Contents for SH3K6
Page 2: ......
Page 4: ...II System Overview ...
Page 5: ...III ...
Page 6: ...IV ...
Page 7: ...V ...
Page 8: ...VI ...
Page 28: ...3 Commissioning Quick User Manual 18 Fig 3 2 Initial Settings ...