29
5
Operation
Refer to
Tab. 3-1 Button Function
for the operation instructions.
5.1
Main Screen
If the inverter succeeds in commissioning, the LCD screen will enter the main screen.
No.
Description
1
Current PV input power
2
Current export power
3 Warning
information
4
Total load consumption
5
Battery charge/discharge power
6
System status bar
: The inverter and the SolarInfo Bank server are successfully connected.
: Blinks if the Wi-Fi is not connected to the router’s Wi-Fi network;
Steady if the Wi-Fi is successfully connected to the router’s Wi-Fi network.
Running
: The inverter is in its normal running state.
16:37
: Current system time.
Neither the grid power nor the load power will be displayed on the main screen in case
of no SUNGROW meter installed.
Tab. 5-1
State Descriptions
State
Description
Running
After being energized, the inverter tracks the PV arrays’ maximum
power point (MPP) and runs with the combination of the energy
management system. This mode is the normal mode.
Maintain
The system is running normally, with the battery in maintenance
process. (Only for lead-acid battery)
Forced
The system is running normally, with the EMS in forced mode.
Standby
The inverter waits for sufficient sunlight or battery level, then the
DC voltage recovers. Refer to
Chapter 11
in the user manual for
standby time setting.
Turn off
The inverter will stop running by manual “OFF” through the LCD
menu. Set to “ON” if you want to restart the inverter.
Startup
The inverter is initializing and synchronizing with the grid.
Summary of Contents for SH3K6
Page 2: ......
Page 4: ...II System Overview ...
Page 5: ...III ...
Page 6: ...IV ...
Page 7: ...V ...
Page 8: ...VI ...
Page 28: ...3 Commissioning Quick User Manual 18 Fig 3 2 Initial Settings ...