1
1
Installation
1.1
Location Requirements
The concrete wall should be suitable for the weight and dimensions of the
inverter.
The location should be convenient for installation, cable connection and service.
The location should be not accessible to children.
The location should be away from flammable materials or gas, and the
environment should not be enclosed.
Flammable wall
Flammable material or
gas near the installation
Closed Cabinet
The shaded side of the building would be better.
Summary of Contents for SH5K
Page 1: ...SH5K QUEN Ver14 201708 Version 1 4 Quick User Manual SH5K Grid Connected Hybrid Inverter ...
Page 2: ......
Page 4: ...II System Overview ...
Page 5: ...III ...
Page 6: ...IV ...
Page 7: ...V ...
Page 8: ...VI ...
Page 9: ...VII ...
Page 10: ...VIII ...
Page 32: ...3 Commissioning Quick User Manual 20 Fig 3 2 Initial Settings ...