Quick User Manual
3 Commissioning
25
3.3
Result Verification
3.3.1 Meter Installation and Connection
The following figure shows the correct installation and connection of the meter.
With the signal from the 1-phase sensor, the inverter determines the energy
exchange with the utility grid on one phase.
Fig. 3-3
Correct Installation and Connection of the Meter
* The CT clamp of 1-phase sensor can be placed before or after the main switch.
Before the verification, proceed as follows:
Disconnect the DC switch between the inverter and the battery module.
Make sure that the L line and N line are connected to the right terminals.
For Incorrect Installation Position
Make sure that the 1-phase sensor of the SUNGROW meter should be placed to the
phase line (L) from the main switch. If otherwise, the energy flow indicated on the
LCD will be wrong.
Summary of Contents for SH5K
Page 1: ...SH5K QUEN Ver14 201708 Version 1 4 Quick User Manual SH5K Grid Connected Hybrid Inverter ...
Page 2: ......
Page 4: ...II System Overview ...
Page 5: ...III ...
Page 6: ...IV ...
Page 7: ...V ...
Page 8: ...VI ...
Page 9: ...VII ...
Page 10: ...VIII ...
Page 32: ...3 Commissioning Quick User Manual 20 Fig 3 2 Initial Settings ...