28
4
Operation
4.1
Main Screen
Refer to
Tab. 3-1 Button Function
for the operation instructions. If the inverter
succeeds in commissioning, the LCD screen will enter the main screen.
No.
Description
1
Current PV input power
2
Current export power
3 Warning
information
4
Total load consumption
5
Battery charge/discharge power
6
System status bar
: The inverter and the SolarInfo Bank server are successfully connected.
: Blinks if the Wi-Fi is not connected to the router’s Wi-Fi network;
Steady if the Wi-Fi is successfully connected to the router’s Wi-Fi network.
Running
: The inverter is in its normal running state.
16:37
: Current system time.
Neither the grid power nor the load power will be displayed on the main screen in case
of no SUNGROW meter installed.
Tab. 4-1
State Descriptions
State
Description
Running
After being energized, the inverter tracks the PV arrays’ maximum
power point (MPP) and runs with the combination of the energy
management system. This mode is the normal mode.
Maintain
The system is running normally, with the battery in maintenance
process. (Only for lead-acid battery)
Standby
The inverter waits for sufficient sunlight or battery level, then the
DC voltage recovers. Refer to
Chapter 11
in the user manual for
standby time setting.
Key-stop
The inverter will stop running by manual “OFF” through the LCD
menu or with the DRM0 command from the DRED. Set to “ON” if
you want to restart the inverter.
Starting
The inverter is initializing and synchronizing with the grid.
Upgrading
The DSP or LCD software is in its upgrading process.
Summary of Contents for SH5K
Page 1: ...SH5K QUEN Ver14 201708 Version 1 4 Quick User Manual SH5K Grid Connected Hybrid Inverter ...
Page 2: ......
Page 4: ...II System Overview ...
Page 5: ...III ...
Page 6: ...IV ...
Page 7: ...V ...
Page 8: ...VI ...
Page 9: ...VII ...
Page 10: ...VIII ...
Page 32: ...3 Commissioning Quick User Manual 20 Fig 3 2 Initial Settings ...