May 2016`
Made in China
4
/
12
A.Post decorative
B.Engine
L.Base
N.Door
G.Table top base
E.Table top
D.Table top decorative
H.Shroud panel (left)
P.Shank(right)
C.Dome brim
F.Post
Q.Regulator
M.Shroud Panel(right)
K.Shank(left)
J.Shank(rear)
Installation and repair should be done by a qualified service person.
The heater should be
inspected before use and at least annually by a qualified service person.
More frequent cleaning may be required as necessary. It is imperative that the control
compartment, burners and circulating air passageways of the heater be kept clean.
Tank supply system must be arranged for vapor withdrawal. The tank used must include a collar
to protect the cylinder valve.
The pressure regulator and hose assembly provided with the appliance must be used. Replace
only with the pressure regulator and hose assembly supplied by manufacturer.
The heater, when installed, must be electrically grounded in accordance with local code or, in the
absence of local codes, with the National Electrical Code, ANSI/NFPA 70.
The minimum permissible gas supply pressure for purpose of input adjustment is 122 PSI.
2. PRODUCT DIAGRAM AND PACKAGE LIST
2.1 Product Diagram
Fig. 2