56 Broome Corporate Parkway
Conklin, NY 13748 USA
P 877.786.6299 | F 877.786.0329
www.sunmaxxsolar.com
Page 23 of 47
o
After installing and adjusting solar water heater, connect cousins with building
plate by the inflated bolt. Fix it more than 4 steel ropes to avoid the demolishment
from the strong wind.
o
Be sure that no leakage in pipeline, joints, valves and etc.
o
The pipeline outside must be dealt with heat preservation and anti-freezing. In
some special cold area, the emptier or restrained temperature anti-freezing cable
should be added.
o
If the solar water heater is not in the protecting scope or lightning conductor fixed
in the buildings, the user should add the lightning conductor. The local power
department must connect the roof conductive part to the ground wire with at least
16 mm grounding cables. For building height (installation height) less than 20
meters, do not need to adopt the special measures to protect lightning strikes
o
When penetrations are required in structural members to accompany passage of
solar components, those modified structural members shall comply with local
building codes.
o
Building materials adjacent to solar equipment shall not be exposed to elevated
temperatures which could accelerate their deterioration. Many non-metal roofing
materials will soften in the temperature range of ---and begin to degrade above
this temperature.
o
The design and installation of systems shall not impair emergency movement of
the building occupa
nts.
The installation shall:
o
NOT IMPAIR ENCLOSURE FUNCTION
o
NOT ALLOW VERMIN INTRUSION
o
MEET APPLICABLE CODES AND NATIONAL ROOFING CONTRACTORS ASSOC.
PRACTICES.