TitanPower-ALDH40-PS Collector Installation
Manual
8
Figure 17. Install bracket connectors
Step 14:
Insert the connection bracket
between the two collectors and secure the
bolts at both the bottom and the top of the
collector.
Step 15:
Bolt the upper roof hook clamp in for the second
collector and install the roof flashing.
Figure 18. Lag bolt the upper roof hook clamp