9
S8
S8-14-22
S22
23
26
20
28
43
45
23
26
20
28
46
44
22
22
22
22
5
4
7
8
80
79
31
31
110
110
6L
6R
STEP: 4
Attach the
Left
and
Right Swing Rods (No. 6/L
and
No. 6/R)
to the
Left
and
Righ
t
Handlebars (No. 4
and
No. 5)
using 2
Bolts (No. 23)
, 2
Arc Washers (No. 26)
, 2
Spring Washers (No. 20)
and 2
Nuts (No. 28)
, secure with
Spanner (No. 109)
.
Attach the
Right Pedal Post (No. 8)
to the
Big Crank Wheel (No. 79)
“right crank arm”,
using the
Right Pedal Bolt (No. 46)
,
Wave Washer (No. 110)
and
Right Nut (No. 44)
.
When tightening the
Right Pedal Bolt (No. 46)
you must turn the bolt
clockwise
.
Attach the
Left Pedal Post (No. 7)
to the
Left Crank Arm (No. 80)
, using the
Left
Pedal Bolt (No. 45)
,
Wave Washer (No. 110)
and
Left Nut (No. 43)
. When tightening
the
Left Pedal Bolt (No. 45)
you must turn the bolt
counter-clockwise
.
Attach
End Caps (No. 22)
over
Bolts (No. 31)
on each side.
Summary of Contents for SF-E2310
Page 6: ...5 HARDWARE PACKAGE...