ASSEMBLY INSTRUCTIONS
STEP 1:
Open the carton and remove all
contents. Place the
Main Frame
(No. A02)
on level ground and
ensure that you have a clean
work space that has adequate
space.
Note:
For safety reasons, do NOT
cut the
Packing Belt
(No. F)
until
you
’ve completed the assembly.
STEP 2:
Lift up the
Left Upright
Tubes (No. A05)
upwards. See
Figure 1
.
Fix the
Left Upright Tube (No.
A05)
to the
Base Frame
(No.
A01)
. Use 1
Bolt
(No. D46)
and 1
Lock Washer (No. D64)
to attach
the side, and 1
Bolt (No. D50)
and
Lock Washer (No. D64)
to attach
the front. Secure using
Allen
Wrench (No. B12)
.
Repeat
the
step
above
to
assemble the
Right Upright Tube
(No. A06)
to the
Base Frame
(No.
A01)
. See
Figure 2
.
NOTE:
During assembly, support
the
Upright Tubes
(No. A05 and
A06)
with your hand to prevent
them from falling down.
Figure 1
Figure 2
7
Summary of Contents for SF-T7512
Page 4: ...EXPLODED DRAWING 3...