Page
- 11 -
of
19
C
、
The collector's assembly reference flat top collector support
assembly step, which except the step for back up supports parts, X shape
parts and other spare part.
Pipeline's connection (sees system schematic diagram)
:
Meets according to the system schematic diagram the pipeline, in cone-
way valve where water inlet. The safety valve installs in the water tank end
specific interface place, the valve end's overflow tube must certainly draw
out to turns on the water safely place. The pipeline must make the heat
preservation, south special area thickness 20mm, the northern area should
thicken the heat preservation (suggestion with the PE material, thickness
30mm), for further frost proof, may install the electricity partner tropics
Care should be taken not to touch the pipe work as it may be HOT!
The pipes between the solar collectors and storage cylinder MUST BE
copper or alternative material pipes that may be supplied by Sunpower.
Plastic pipe is NOT suited to the water temperatures and pressures that may