occur in the system.
Insulation pipe must comply with the relevant technical standards,
must be black EPP insulation cotton, thickness must be not less than 35
mm, 50 mm is recommended in cold regions; outside must be wrapped in
aluminum foil and UV resistant special tape.
Installment matters attention
:
◇
Between the collector and the heat preservation water tank circulates
the pipeline to reduce t he knee bend as far as possible; take the shortest
distance as good.
◇
The
collector
and
the
water
tank
install
the
height
difference
≤
10m
。
1. Electric circuit's connection
2. The electric circuit installment should strictly according to the
conventional electrician standard operation
a The power line is three, respectively is L, N and the grounding, uses
1.5mm2 the power line, according to chart connection
b Examination: After the electric circuit meets, before the circular
telegram use, the examination leakage protects the plug “L” and “N” the
resistance should during 30~40 ohms, “L” and the place, “N” and
resistance between the place should above 2,000,000,000,000 ohms
The water quality of most public supplies is suitable for the water heating
system. The water quality from bore wells is generally unsuitable for the
water heating system.