background image

 

5

PANEL ASSEMBLY

 

1.  Choose placement for your solar panel(s). Make sure that it will be in the sun for most of the day. The area should be 

clear of sharp objects. 

2. 

Take the panel out of the box, remove the strap from panel and let the panel sit in the sun for approximately 30 
minutes so it will become flexible.

 

3.  a)  

Installation: one system on ground

.  

 
 

 

 
 
 
 
 
 

 
 
 

 
 
 
 
 
 
 

 

 

Diagram Step 3a 

 

 

Apply Teflon tape to threads of 2 caps (

SK-FTG-F

 ) See Fig 3a-1 

 

Thread the caps into the panels as per Diagram Step 3a.  
Do not over tighten. See Fig 3a-2  

 

Put "O" rings (

SK-FTG-I

) on both combination adapters (

SK-FTG-

D

) See Fig 3a-3. Thread both combination adapters into the panels 

as per Diagram Step 3a. Do not over tighten. See Fig 3a-4 

 

Apply Teflon to threads of by-pass valve (

SK-INT-V

).  

 

Screw side of valve with handle into the panel as per Diagram 
Step 3a. Do not over tighten. See Fig 3a-7 

 

Loosen the union on the valve. See Fig 3a-8. 

 

Screw other side of valve into the panel as per Diagram Step 3a. 
Do not over tighten. See Fig 3a-9. Tighten the union on the valve.  

 

Push the rubber hose (

SK-FTG-J

) over the panel header as per 

      Diagram Step 3a. Slide a metal collar (

SK-FTG-L

) onto the  

      rubber hose. Place metal collar 

1

/

4

" from edge and tighten collar 

      with screwdriver. See Fig 3a-10. 

 

Slide another metal collar onto the rubber hose. Connect the 2 

      panels together by pushing the rubber hose over the second 
      panel header. Tighten metal collar to secure assembly. See Fig 3a-11 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

C

o

m

b

in

a

ti

o

n

 A

d

a

p

te

r

 

B

y

-p

a

ss

 V

a

lv

C

a

p

 

R

u

b

b

er

 h

o

se

 

7

.5

"

 

Fig 3a-1

 

Fig 3a-2

 

Fig 3a-3

 

Fig 3a-4

 

Inlet 

Outlet 

Fig 3a-10

 

Fig 3a-11

 

Fig 3a-9

 

Fig 3a-8

 

Fig 3a-7

 

Summary of Contents for SQ-2220-ID

Page 1: ...Model SQ 2220 ID INSTALLATION OPERATION MANUAL Read all the instructions before installing your solar heating system...

Page 2: ...y from your pool or one story up then your pump may need to be 1HP or more Where can the solar panel be placed The solar panel can be placed on the ground Avoid placing in high traffic areas as it is...

Page 3: ...ve Optional parts Roof Mounting Kit SQ RMK5 High Wind Roof Mounting Kit SQ HWK 1 SQ RMK5 per SQ 2220 system is required for Roof For high wind areas to be used in addition to the roof mounting or Rack...

Page 4: ...Description 1 SK FTG A Threaded 2 way valve 4 SK FTG K Rubber hose 3 75 2 SK FTG B Threaded nipple 8 SK FTG L Metal collar Hose clamp 2 SK FTG C Threaded tee 1 SK VRV Vacuum Relief Valve 4 SK FTG D T...

Page 5: ...ig 3a 4 Apply Teflon to threads of by pass valve SK INT V Screw side of valve with handle into the panel as per Diagram Step 3a Do not over tighten See Fig 3a 7 Loosen the union on the valve See Fig 3...

Page 6: ...Put O rings SK FTG I on both combination adapters SK FTG D See Fig 3a 3 Thread both combination adapters into the panels as per Diagram Step 3b Do not over tighten See Fig 3a 4 Push the rubber hose yo...

Page 7: ...ver See Fig 3a 10 Repeat for other end of panel Slide another metal collar onto the rubber hose Connect the 2 panels together by pushing the rubber hose over the second panel header Tighten metal coll...

Page 8: ...ap for this type of installation Thread the cap into the panels as per Diagram Step 3d Do not over tighten See Fig 3a 2 If you are using flexible piping to connect panels to your pump then put O rings...

Page 9: ...SK FTG K to connect the two set together as per Diagram Step 3d Install mounting kits as per instructions included with them Panels must be installed with a slight slope minimum 2 inch per 10 feet to...

Page 10: ...tightened Unblock the inlet and outlet of your pool 5 Make sure the valve on the integrated diverter is on the open position See Fig C1 1 Valve in the open position Valve in the closed position Solar...

Page 11: ...plied and connect it to the last open end of the diverter kit Place metal collar and tighten Connect the other end of the hose to your pool inlet Place metal collar and tighten See diagram C 2 7 Make...

Page 12: ...that all your piping in drained 4 Run you feed and return PVC piping from your pool to your solar panels Make sure piping is installed in such a way to allow proper drainage 5 Make sure that your pipi...

Page 13: ...losed turn your by bass valve in such a way to allow the water from your panels to drain Wait half an hour for panels to drain Unscrew the Vacuum Relief Valve or the Threaded cap at the top of the sol...

Page 14: ...logies Inc Claims will not be accepted for a solar panel s damage in transit unless damage to shipping container is noted at time of delivery on the transport company s delivery bill Sunsolar Energy T...

Reviews: