background image

 

6

b)  

Installation: one system on rack or roof

(Horizontal only)

 

1 - Mounting kit (part # SQ-RMK5) is required

 

 
 
 

 

 
 

 
 
 
 
 
 

 
 

 
 
 
 
 
 
 

 

 

Diagram Step 3b

 

 

 

The integrated by-pass valve (

SK-INT-V

needs to be accessible in order to turn the 

solar heating system On & Off. For this type of installation, the valve will be installed 
near the pump. See Connecting to Pool System with diverter near pump on page 11.  
 

Note: If you are installing on a rack that is easily accessible, you can connect the panel like a "on ground installation" 

   See Diagram Step 3a. For mounting the panels, follow the instruction included with the mounting kit. 

 

 

Using a utility knife or a hand saw, cut rubber hose (

SK-FTG-J

) in half. Make sure 

      you cut it as straight as possible. See Fig 3b-1. You should now have two rubbers 
      3 ¾" long. 

 

Apply Teflon on two of the caps (

SK-FTG-F

). See Fig 3a-1. 

 

Thread the 2 caps into the panels as per Diagram Step 3b. Do not over tighten.  

      See Fig 3a-2 

 

Put "O" rings (

SK-FTG-I

) on both combination adapters (

SK-FTG-D

) See Fig 3a-3. Thread both combination 

adapters into the panels as per Diagram Step 3b. Do not over tighten. See Fig 3a-4 

 

Push the rubber hose you cut in half previously over the panel header as per Diagram Step 3b. Slide a metal 
collar (

SK-FTG-L

) onto the rubber hose. Place metal collar 

1

/

4

" from edge and tighten collar with screwdriver. 

See Fig 3a-10. Repeat for other end of panel. 

 

Slide another metal collar onto the rubber hose. Connect the 2 panels together by pushing the rubber hose 
over the second panel header. Tighten metal collar to secure assembly. See Fig 3a-11. Repeat for other end 
of panel. 

 

Install mounting kits as per instructions included with them.

 Panels must be installed with a slight 

slope (minimum 2 inch per 10 feet) toward the inlet

. This will allow the panel to drain properly. 

 
 

Note: The inlet must always be at the lower end of the panel and the outlet at the higher end of the panel. 

 
 
 
 
 
 
 
 

 

 

C

a

p

 

C

a

p

 

R

u

b

b

er

 h

o

se

 

3

.7

5

"

 

R

u

b

b

er

 h

o

se

 

3

.7

5

"

 

Fig 3b-1

 

Inlet 

Outlet 

A Minimum of 2 inch fall per 10 feet 

C

o

m

b

in

a

ti

o

n

 A

d

a

p

te

r

 

C

o

m

b

in

a

ti

o

n

 A

d

a

p

te

r

 

Summary of Contents for SQ-2220-ID

Page 1: ...Model SQ 2220 ID INSTALLATION OPERATION MANUAL Read all the instructions before installing your solar heating system...

Page 2: ...y from your pool or one story up then your pump may need to be 1HP or more Where can the solar panel be placed The solar panel can be placed on the ground Avoid placing in high traffic areas as it is...

Page 3: ...ve Optional parts Roof Mounting Kit SQ RMK5 High Wind Roof Mounting Kit SQ HWK 1 SQ RMK5 per SQ 2220 system is required for Roof For high wind areas to be used in addition to the roof mounting or Rack...

Page 4: ...Description 1 SK FTG A Threaded 2 way valve 4 SK FTG K Rubber hose 3 75 2 SK FTG B Threaded nipple 8 SK FTG L Metal collar Hose clamp 2 SK FTG C Threaded tee 1 SK VRV Vacuum Relief Valve 4 SK FTG D T...

Page 5: ...ig 3a 4 Apply Teflon to threads of by pass valve SK INT V Screw side of valve with handle into the panel as per Diagram Step 3a Do not over tighten See Fig 3a 7 Loosen the union on the valve See Fig 3...

Page 6: ...Put O rings SK FTG I on both combination adapters SK FTG D See Fig 3a 3 Thread both combination adapters into the panels as per Diagram Step 3b Do not over tighten See Fig 3a 4 Push the rubber hose yo...

Page 7: ...ver See Fig 3a 10 Repeat for other end of panel Slide another metal collar onto the rubber hose Connect the 2 panels together by pushing the rubber hose over the second panel header Tighten metal coll...

Page 8: ...ap for this type of installation Thread the cap into the panels as per Diagram Step 3d Do not over tighten See Fig 3a 2 If you are using flexible piping to connect panels to your pump then put O rings...

Page 9: ...SK FTG K to connect the two set together as per Diagram Step 3d Install mounting kits as per instructions included with them Panels must be installed with a slight slope minimum 2 inch per 10 feet to...

Page 10: ...tightened Unblock the inlet and outlet of your pool 5 Make sure the valve on the integrated diverter is on the open position See Fig C1 1 Valve in the open position Valve in the closed position Solar...

Page 11: ...plied and connect it to the last open end of the diverter kit Place metal collar and tighten Connect the other end of the hose to your pool inlet Place metal collar and tighten See diagram C 2 7 Make...

Page 12: ...that all your piping in drained 4 Run you feed and return PVC piping from your pool to your solar panels Make sure piping is installed in such a way to allow proper drainage 5 Make sure that your pipi...

Page 13: ...losed turn your by bass valve in such a way to allow the water from your panels to drain Wait half an hour for panels to drain Unscrew the Vacuum Relief Valve or the Threaded cap at the top of the sol...

Page 14: ...logies Inc Claims will not be accepted for a solar panel s damage in transit unless damage to shipping container is noted at time of delivery on the transport company s delivery bill Sunsolar Energy T...

Reviews: