CHAPTER EIGHT
TILLER & FOOTBOARD REMOVAL
21
22
23
24
ST PS
Sunrise Training and Education Programmes
Lifting The
Footbard
19
20
Lift the back of the footboard clear of the
Gem-lock mechanism.
Lift the footboard and rest it on the chassis to
access the loom & plugs.
Locate the main tiller loom as shown.
Cut the plastic tie wraps making a note of
their position.
Cut the tie wrap at the other end of the loom.
Disconnect the loom plug from the main
control box.
20
20
20
20
20
Summary of Contents for Sterling Pearl
Page 42: ......