XTT 5000 User's Manual
Summary Results
Get an overview of the Throughput test results.
It may take a few seconds for results to appear after starting a test.
The left side of the window displays:
Elapsed Time
: How long the test has been running.
Remaining Time
: How long remains in a scheduled test, or
Continuous.
Banner
: A
of the status of the test. It reports any errors
or alarms, along with a date and time stamp.
Below the banner, view a list of logged
: received errors and/or alarms, e.g.
Lost Frame, including a count of the number of errors, with a resolution of one
second.
The right side of the window shows more specific results.
In a Live throughput test, statistics are taken on frames, but the test does not look
for pattern synchronization or bit errors (no Bit statistics appear).
For a Monitor test, only receive (RX) statistics are reported.
Status
: Statistics status.
Statistic Meaning
TX Utilization
Transmitted bandwidth as a percentage of maximum
traffic rate (minimum frame gap).
TX Line Rate
Transmitted bit rate (in kbps, bps, etc.) of the Ethernet
frames, ignoring the frame gap, preamble, and SAD. The
data rate is always less than the line rate.
TX Data Rate
Transmit data rate (in kbps, bps, etc.). This includes the
frame headers but not the IPG or Preamble. Thus, the
data rate reflects both the frame rate and frame size.
RX Utilization
Received bandwidth as a percentage of maximum traffic
rate (minimum frame gap).
RX Line Rate
Received bit rate, based on the current utilization.(in kbps,
bps, etc.).
RX Data Rate
Received bit rate of the Ethernet frames, ignoring the
frame gap, preamble, and SAD. The data rate is always
less than the line rate (in kbps, bps, etc.).
Signal
The signal information (vendor, wavelength, optical power,
etc.) is provided by the SFP/XFP module. Not all
manufacturers supply this information, and Sunrise
Telecom Inc. is not responsible for modules provided by
other vendors.
•
Vendor
: Name of the vendor;
•
Wavelength
: Optical wavelength is use at the
port.
•
RX Optical Power
: Received uW and dBm.
Where do you want to go next?
74
Summary of Contents for XTT 5000
Page 1: ...XTT 5000 User s Manual...
Page 2: ......
Page 6: ......
Page 36: ......
Page 55: ...Throughput Testing L2 BERT Diagram Home Layer 2 BERT Where do you want to go next Home 49...
Page 58: ...XTT 5000 User s Manual Throughput Stream Results Throughput Test Setup Working Desktop Home 52...
Page 61: ...Throughput Testing Home 55...
Page 67: ...Throughput Testing Throughput Aggregate Results Throughput Stream Results Home 61...
Page 81: ...Throughput Testing Working Desktop Home 75...
Page 83: ...Throughput Testing Home 77...
Page 116: ......
Page 142: ......
Page 147: ...Save Features 141 RFC2544 NE Applications IP Test Setup Monitor Setup Loopback Test Setup Home...
Page 148: ......
Page 172: ......