Form 44201440
14
Oct 2018
It is recommended that two people lift the heater out of the carton. Do not remove from the
remaining packaging until the heater is ready to be hung.
INSTALLATION
In order to protect the ceramic glass it is recommended to only insert the ceramic glass once all the other installation
steps have been completed. The ceramic glass must be removed to wire the heater and for commissioning.
Various means of suspending the heater can be used. See the following drawings for typical examples.
a)
Heaters installed outdoors or in areas subject to strong winds must be installed using the optional hanging
brackets or suitable rigid mount hardware. Chain, cable and other flexible hanging methods are not
recommended.
b)
Use only noncombustible materials for suspending hangers and brackets.
c)
Turnbuckles can be used with chains to allow leveling of the heater. All “S” hooks and eye bolts must be
manually crimped closed by the installer.
d)
Heaters must not be supported by gas or electric supply lines and must be suspended from a permanent
structure with adequate load capacity.