[Setting power voltage switching connector]
17
55
Preparation before operating machine
1) Setting voltage
A. Control box internal structure of SPS/c-series is as the
following figure 7.
B. Check if the position of power voltage switching connector
on power board and used trans are properly selected
according to the input voltage as in the table1, table2.
For example) In case of 220 voltages, used trans model
should be “SPS-5050-220CE” and the
position of power voltage switching connector
should be “JP5”.
※
Trans model sticker is attached on the top of trans.
C. Check if power switch is for three-phase or one-phase.
D. If the settings in B and C are not proper, it may result in the machine breakdown. Therefore, follow the following instruction.
ⓐ
When power voltage switching connector is put at the wrong place.
①
Separate connector linked to trans from power board of CN7, CN8, and CN9.
②
Switch the power voltage switching connector into the right place of table1 and plug it.
③
Connect connector linked to trans with power board of CN7, CN8, and CN9.
ⓑ
If used trans and power switch are not in accordance with the specification, exchange or repair at the purchasing place.
[Table 1. Voltage switching connecter position]
[Table2. Used trans model according to input power voltage]
Input voltage
95V~105V
106V~115V
116V~125V
200V~230V
231V~245V
345V~415V
416V~480V
Power voltage switching connector
JP4
JP3
JP2
JP5
JP4
JP3
JP2
Power voltage
100V~120V
380V~415V
200V~220V
SPS/C-Series
″
SPS-5050-220CE
″
″
1Phase 2.2KA 415V
″
″
SPS-5050-220CE
″
Machine model
[Note]
Make sure that the air should be filled before turning on the power switch.
Y-shaft motor drive
X-shaft motor drive
Main-shaft motor
operating board
Power board
Cooling pan
Relay board
[Setting power voltage switching connector]
트렌스
lower-shaft motor drive
X축 모터 드라이버
[ Fig. 7 ]