ECCO SG04LP1 | User Manual
49
5.14. Program Charge & Discharge Times
To set ‘Charge’ and ‘Discharge’ times, click on the ‘System Mode’ icon after clicking on the gear icon.
What this page displays:
A setting to prevent the inverter exporting power to the grid - ‘Zero Export’.
The ability to limit power supply to only the household loads - ‘Solar Export’.
Set the power limits to supply only the loads connected to the LOAD port - ‘Priority to Load Only’.
What you can do from this page:
Set a real time to start and stop charging or discharging the battery.
Choose to charge the battery from the grid or generator.
Limit export power to the grid.
Set the unit to charge the battery from the grid or generator ticking ‘Grid’ or ‘Gen’ and set what times this
needs to occur.
Set the time to discharge the unit to the load or export to the grid by unticking ‘Grid’ and ‘Gen’.
Summary of Contents for ECCO SUN-3.6K-SG05LP1-EU
Page 9: ...ECCO SG04LP1 User Manual 9 2 1 Product Size ...
Page 17: ...ECCO SG04LP1 User Manual 17 4 5 Function Port Definition ...
Page 21: ...ECCO SG04LP1 User Manual 21 ...
Page 23: ...ECCO SG04LP1 User Manual 23 4 9 1 Recommended AC Surge Protector ...
Page 26: ...ECCO SG04LP1 User Manual 26 4 12 Meter Connection 4 12 1 System Connection for the CHNT Meter ...
Page 27: ...ECCO SG04LP1 User Manual 27 4 13 Wiring System for Inverter ...
Page 30: ...ECCO SG04LP1 User Manual 30 4 16 Single Phase Parallel Connection Diagram 03 02 01 ...
Page 31: ...ECCO SG04LP1 User Manual 31 4 17 Three Phase Parallel Inverter 03 02 01 ...
Page 32: ...ECCO SG04LP1 User Manual 32 4 18 Typical Application Diagram of Diesel Generator ...
Page 63: ...ECCO SG04LP1 User Manual 63 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator ...
Page 64: ...ECCO SG04LP1 User Manual 64 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple ...
Page 65: ...ECCO SG04LP1 User Manual 65 ...
Page 71: ...Ltd wered by Po ...