ECCO SG04LP1 | User Manual
51
Example:
The power produced is supplying the ‘Non-Essential Load’ while the inverter is set at a maximum power
of 8kW (Max Sell Power). The inverter is connected to the grid, but no export is performed. The unit allows
small amounts of power to flow from the Grid (100W Zero Export Power) to prevent any back-flow. In this
example, the solar PV is prioritised to supply the Load first and then subsequently, charge the battery.
5.15. Grid Supply Page
On the Settings Menu, click on the GRID icon.
Summary of Contents for ECCO SUN-3.6K-SG05LP1-EU
Page 9: ...ECCO SG04LP1 User Manual 9 2 1 Product Size ...
Page 17: ...ECCO SG04LP1 User Manual 17 4 5 Function Port Definition ...
Page 21: ...ECCO SG04LP1 User Manual 21 ...
Page 23: ...ECCO SG04LP1 User Manual 23 4 9 1 Recommended AC Surge Protector ...
Page 26: ...ECCO SG04LP1 User Manual 26 4 12 Meter Connection 4 12 1 System Connection for the CHNT Meter ...
Page 27: ...ECCO SG04LP1 User Manual 27 4 13 Wiring System for Inverter ...
Page 30: ...ECCO SG04LP1 User Manual 30 4 16 Single Phase Parallel Connection Diagram 03 02 01 ...
Page 31: ...ECCO SG04LP1 User Manual 31 4 17 Three Phase Parallel Inverter 03 02 01 ...
Page 32: ...ECCO SG04LP1 User Manual 32 4 18 Typical Application Diagram of Diesel Generator ...
Page 63: ...ECCO SG04LP1 User Manual 63 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator ...
Page 64: ...ECCO SG04LP1 User Manual 64 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple ...
Page 65: ...ECCO SG04LP1 User Manual 65 ...
Page 71: ...Ltd wered by Po ...