ECCO SG04LP1 | User Manual
66
The inverter must be installed by a qualified / licensed electrical engineer in accordance to the countries
wiring regulations.
Before switching on, the installation engineer must have completed the Earth Bond, RCD and earth leakage
tests, checked that the solar panel Voc voltage does not exceed 480V and checked the battery voltage.
Power ON Sequence:
1. Switch on AC
2. Press Start Button
3. Switch on Battery and battery breaker
4. Switch on the DC (PV Isolator)
Shutdown Sequence:
1.
Switch off AC
2. Press the start button
3.
Switch off the battery and the battery breaker
4.
Switch off the DC (PV isolator)
7. COMMISSIONING
7.1. Start-Up / Shutdown Procedure
Summary of Contents for ECCO SUN-3.6K-SG05LP1-EU
Page 9: ...ECCO SG04LP1 User Manual 9 2 1 Product Size ...
Page 17: ...ECCO SG04LP1 User Manual 17 4 5 Function Port Definition ...
Page 21: ...ECCO SG04LP1 User Manual 21 ...
Page 23: ...ECCO SG04LP1 User Manual 23 4 9 1 Recommended AC Surge Protector ...
Page 26: ...ECCO SG04LP1 User Manual 26 4 12 Meter Connection 4 12 1 System Connection for the CHNT Meter ...
Page 27: ...ECCO SG04LP1 User Manual 27 4 13 Wiring System for Inverter ...
Page 30: ...ECCO SG04LP1 User Manual 30 4 16 Single Phase Parallel Connection Diagram 03 02 01 ...
Page 31: ...ECCO SG04LP1 User Manual 31 4 17 Three Phase Parallel Inverter 03 02 01 ...
Page 32: ...ECCO SG04LP1 User Manual 32 4 18 Typical Application Diagram of Diesel Generator ...
Page 63: ...ECCO SG04LP1 User Manual 63 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator ...
Page 64: ...ECCO SG04LP1 User Manual 64 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple ...
Page 65: ...ECCO SG04LP1 User Manual 65 ...
Page 71: ...Ltd wered by Po ...