Page | 28
Hybrid Inverter | Installer Manual
4.8. Earth Connection (MANDATORY)
Ground cable shall be connected to ground plate on grid side this prevents electric shock if the
original protective conductor fails.
When the inverter is in the off-grid state, the N line needs to be connected to the
earth.
In final installation,breaker certified according to IEC 60947-1 and IEC 60947-2 shall
be installed with the equipment.
4.9. WIFI Connection
For the configuration of Wi-Fi Plug, please refer to illustrations of the Wi-Fi Plug.
Summary of Contents for SUN-25K-SG01HP3-EU-BM2
Page 19: ...Page 19 Hybrid Inverter Installer Manual 4 4 1 Function Ports Definition ...
Page 26: ...Page 26 Hybrid Inverter Installer Manual ...
Page 27: ...Page 27 Hybrid Inverter Installer Manual ...
Page 29: ...Page 29 Hybrid Inverter Installer Manual 4 10 Wiring System for Inverter ...
Page 30: ...Page 30 Hybrid Inverter Installer Manual 4 11 Wiring Diagram ...
Page 31: ...Page 31 Hybrid Inverter Installer Manual ...
Page 32: ...Page 32 Hybrid Inverter Installer Manual 4 12 Typical Application Diagram of Diesel Generator ...