background image

SUN-BATT-5.12 | User Manual

10

3.3. 

Tools

Tools

Installation

Knife

Measuring tape

Socket wrench (10/16mm)

Rubber mallet

Cross Screwdriver

Hammer drill (8mm)

Protection

ESD gloves

Safety goggles

Anti-dust respirator

Safety shoes

3.4. Installation Requirements

3.4.1. Installation Environment Requirements  

 

ƒ

Install the battery in the indoor environment.

 

ƒ

Place battery in secure location away from children and animals.

 

ƒ

Do not place the battery near any heat sources and avoid sparks.

 

ƒ

Do not expose the battery to moisture or liquids.

 

ƒ

Do not expose the battery to direct sunlight.

3.4.2. Installation Carrier Requirements   

 

ƒ

Only mount battery on fire resistant building. Do not install batteries on flammable buildings.

 

ƒ

Battery is quite heavy, make sure the wall/ground can meet the load bearing requirements.

Summary of Contents for SUN-BATT-5.12

Page 1: ...h China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sales sunsynk com USER MANUAL v 6 11 05 22 SUN BATT 5 12 BYD 100Ah Wall Mounted ...

Page 2: ...ng Deliverables 8 3 3 Tools 10 3 4 Installation Requirements 10 3 4 1 Installation Environment Requirements 10 3 4 2 Installation Carrier Requirements 10 3 5 Installation Instructions 11 3 5 1 Dimensions 11 3 5 2 Installation Procedure 12 4 BATTERY POWER AND COMMUNICATION CONNECTIONS 15 4 1 Parallel Cascade Connection 15 4 1 1 Power Cable Wiring Instructions 15 4 1 2 Communication Cable Connection...

Page 3: ...50A Nominal Charge Discharge Power 2500W Max Charge Discharge Current 100A Max Charge Discharge Power 5000W Short Circuit Current 350A Communication Display SOC status indicator LED indicator Communication RS232 RS485 CAN General Specification Dimension W D H mm 450 150 533mm Weight Kg 47kg Installation Floor stand or Wall mounted Working Temperature2 20ºC 60ºC Storage Temperature 25ºC 12 months 3...

Page 4: ...n apply Refer to SUN BATT 5 12 Warranty Letter General Specification Operating Storage humidity 95 RH Max Operating Altitude 2000m IP Rating IP20 Cell Technology LiFePO4 Lithium ion Phosphate Cycle life3 6000 Cycles 80 DOD 25ºC 0 5C 60 EOL Scalability Max 8 batteries in parallel Standard Compliance Certification UN38 3 IEC62619 IEC62040 1 more available upon request Ordering and Deliverable Part P...

Page 5: ...TT 5 12 has built in BMS Battery Management System which can manage and monitor cells informa tion including voltage current and temperature Besides that BMS can balance cells charging to extend cycle life BMS has protection functions including over dis charge over charge over current and high low temper ature the system can automatically manage charge state discharge state and balance state Multi...

Page 6: ... ON For single SUN BATT 5 12 switch ON rocker switch then long press more than 3 seconds ON OFF button on front panel LED will flash then battery will operate normally L1 to L6 shows battery SoC L7 L8 shows battery status For multiple SUN BATT 5 12 in parallel switch ON rocker switch on all batteries long press more than 3 sec onds ON OFF button of MASTER battery LED will flash battery system will...

Page 7: ...nstructions Status Charging Battery Level Indicator L8 L7 L6 L5 L4 L3 L2 L1 Battery Level 0 17 Light OFF OFF OFF OFF OFF OFF Flash 2 18 33 OFF OFF OFF OFF Flash 2 Light 34 50 OFF OFF OFF Flash 2 Light Light 51 66 OFF OFF Flash 2 Light Light Light 67 83 OFF Flash 2 Light Light Light Light 84 100 Flash 2 Light Light Light Light Light Full Charged Light Light Light Light Light Light Discharging Batte...

Page 8: ...r as soon as possible You are advised to remove the packing materials within 24 hours before installing the battery 3 2 Checking Deliverables After unpacking the battery check whether deliverables are intact and complete If any damage is found or any component is missed contact the dealer The below table shows the components and mechanical parts that should be delivered Start END Check Before Inst...

Page 9: ...ser Manual 9 NO Pictures Quantity Description 1 1PCS Battery 2 1PCS Wall bracket 3 2PCS Hanging bracket 1 4 2PCS Hanging bracket 2 5 6PCS M8 60 6 8PCS M6 16 7 4PCS M4 20 8 1PCS M4 20 9 1PCS Manual 10 1PCS Test report ...

Page 10: ...nts Install the battery in the indoor environment Place battery in secure location away from children and animals Do not place the battery near any heat sources and avoid sparks Do not expose the battery to moisture or liquids Do not expose the battery to direct sunlight 3 4 2 Installation Carrier Requirements Only mount battery on fire resistant building Do not install batteries on flammable buil...

Page 11: ...SUN BATT 5 12 User Manual 11 3 5 Installation Instructions 3 5 1 Dimensions Minimum mounting distance between battery pack and equipment ...

Page 12: ...ual 12 3 5 2 Installation Procedure STEP 1 Drill the hole with an 10mm drill bit as follows and fix the wall bracket to the wall STEP 2 Install the hanging bracket STEP 3 Hang SUN BATT 5 12 on the wall bracket and tighten it ...

Page 13: ...SUN BATT 5 12 User Manual 13 STEP 4 Connect to ground STEP 5 Connect power cable STEP 6 Connect communication cable ...

Page 14: ...SUN BATT 5 12 User Manual 14 STEP 7 Connect communication cable ...

Page 15: ...e others as slaves One of the Master pack P terminals should connect to the PCS and the other should connect to another battery for capacity expansion One of the P terminals of the last Slave pack should connect to PCS and the other should connect to another battery for capacity expansion For the other Slave packs each P terminal should be connected to another battery s terminal 4 1 Parallel Casca...

Page 16: ...ns of a system with four batteries packs one Master and three Slaves The CAN communication port of the Master pack should connect to PCS Port In from the Master pack should not be connected The Port Out from the master PACK should connect the Port In of the first slave PACK using a parallel communication wire The Port Out of the first Slave pack should connect to the Port In of the second Slave PA...

Page 17: ...d length min 1500mm The P and P power line between the busbar and the PCS should be able to support 200A rated current You are advised to use the EV power cable with size min 50 mm2 or 0AWG 600V 210A Before assembling Power cable label the cable polarities correctly to ensure correct cable connec tions and identification The power cables installation and connection must be carried out by trained p...

Page 18: ...10 25ºC 5 70 12 months 30 SOC 60 25 35ºC 5 70 6 months 30 SOC 60 35 45ºC 5 70 3 months 30 SOC 60 Above 45ºC prohibit Over discharged 90 DoD battery should be recharged according to following table otherwise over dis charged battery will be damaged Recharge conditions when battery is over discharged Storage Environment Temper ature Storage Time Note 10 25ºC 15 days Battery Pack disconnected from PC...

Page 19: ...Ltd wered by Po ...

Reviews: