OPERATION & MAINTENANCE MANUAL SWE18UF
56
4.2 MAINTENANCE GUIDE
4.2.1 Adding Lubricant Grease
Parts name
Qty.
Interval
(
hours
)
8
50
100
250
500
1000
2000
Each
junction
pin shaft of
working
device
Junction pin shaft of
boom and platform
1
▲
Pin shaft on two ends of
boom cylinder
2
▲
Each pin shaft of bucket
and arm
8
▲
Pin shaft on two ends of
dozer cylinder
2
▲
Junction pin shaft of
dozer blade and chassis
2
▲
Swing bearing track
1
▲
Inner swing gear ring
1
▲
Control lever
4
During maintenance
Position: bucket, arm, boom, slewing gear, slewing bearing, etc.
From —20 to 40
C
(
from —4 to 104F
)
BP petroleum
BP Energrease Ls—EP2
Caltex petroleum
Multifax EP2
Esso
Beacon EP2
Japan
Daphne Coronex Grease EP2
Mobil petroleum
Mobilux EP2
Germany
2# lithium grease
★
Shell
Shell Alvania EP Grease 2
Remark
Heavy duty lithium grease
Note
:
The excavator departed from factory has been filled with “★” marked engine