OPERATION & MAINTENANCE MANUAL SWE18UF
79
A. Inspection
1).
Slowly operate the control valve, use the
operation device and dozer blade to lift the
machine.
2).
Check the center under surface of the track
frame and the clearance of the up surface (A),
the clearance should be within following range:
A 65~70mm.
B. Adjustment
Increase tension power
1)
Take off cover
①
.
2)
Use grease gun to inject grease into grease pressure
relief valve
②
through grease nozzle.
3)
Check the track tension.
Decrease tension power
1)
Take off cover
①
.
Please use wood block, jack or other firm and stable supporter to lift the machine.
Never work while there is not enough support of the machine, especially when the
hydraulic cylinder is working.
There is pressure grease in the track tightening mechanism, the grease pressure relief
valve may fly out and cause damage if you do not operate as the follow procedures.
Slowly screw off the grease pressure relief valve.
Never let your body, face, legs or arms be exposed in front of the grease pressure
relief valve.
Two men are needed when checking the track tensity, one operate the excavator to lift
the track of one side, the other one measure the dimension, you must pay more attention
to prevent the sudden movement of the machine. Warn up the engine before the checking
work and park the machine on a level ground, and use stoppers if necessary.
If there is too much dirt, dust or other
things on the undercarriage assembly, you
may get an incorrect measure result, so you
must clean the undercarriage before the
measuring work.
FIG.100
FIG.98
Never start engine when the hydraulic
oil tank is empty.