2-8
Publication: 0028607
PRE-OPERATION
2
Water System
CAUTION
1.
Locate a known sewer line that is as large as
possible and is long enough to pay out all the hose
on the reel.
NOTE
The sewer line must not be located in residential
areas to avoid damage to homes and businesses
when using maximum water pressure.
2.
Pay out the entire length of sewer hose at the lowest
possible pressure (800 psi).
3.
When all the hose is paid out, increase the water
pressure to maximum and rewind the hose back onto
the reel under pressure.
The system consists of water tanks (1) saddled along the
side of the debris body (2), a water pump (3), a suction
line shutoff valve (4), and a Y-strainer (5).
Figure 2-12
When purchasing a new truck or when installing a
new sewer hose on an existing reel, you must
follow a procedure to pressurize the new hose
(one time only).
Failure to follow this procedure could result in
loose wraps and/or severe pinching of the hose
and possible damage to the reel itself.
5
3
2
1
4
Summary of Contents for Camel 1200 (Dump Body)
Page 1: ......
Page 2: ......
Page 4: ......
Page 62: ...1 52 Publication 0028607 SAFETY 1...
Page 64: ...2 2 Publication 0028607 PRE OPERATION 2 Figure 2 1 Figure 2 2 1 3 2 5 6 4 7...
Page 106: ...4 18 Publication 0028607 SEWER CLEANING TYPICAL SEQUENCE 4...
Page 118: ...5 12 Publication 0028607 WATER RECYCLING SYSTEM 5...
Page 132: ...6 14 Publication 0028607 LUBRICATION AND MAINTENANCE 6...
Page 156: ...i vi Publication 0028607 IX...
Page 157: ......