SECTION 03 35 43                                                                 Updated April 6, 2011 

 

C.

 

Application of finish system shall take place a minimum of 21 days prior to 
fixture and trim installation and/or substantial completion. 

D.

 

Finish Concrete area shall be closed to traffic during finish floor application 
and after application, for the time as recommended by manufacturer. 

 
 

 

1.09

 

CONCRETE MIX DESIGN 

Note to specifier:   

1.

 

Minimum concrete compressive strength should be 3,500 psi. 

2.

 

Normal Weight concrete, No light weight aggregate. 

3.

 

Non-Air entrained. 

4.

 

Natural Concrete slump of 4 ½ to 5”, Admixtures may be used. 

5.

 

Flatness requirements: 

a.

 

Overall  Ff 40 

b.

 

Local   Ff 20 

c.

 

Overall FL not required 

d.

 

Local FL not required 

2.

 

Tight Hard Troweled (three passes) concrete.  No burn marks. 
Reference ACI 302.1R, class 5 or class 6 floor. 

3.

 

Curing:  Options:   

a.

 

ASTM C 309 Membrane forming curing 
compound 

i.

 

No acrylic curing and sealing 
compounds. 

b.

 

ASTM C 171 Sheet membrane 

c.

 

Damp curing, seven-day cure.  

 

 

PART 2 PRODUCTS AND MANUFACTURERS 
 
 
2.01

 

ACCEPTABLE PRODUCTS AND MANUFACTURERS

 

 

A.

 

3 or 6 head planetary rotating InovaCrete

®

 approved floor grinder with at least 

300 pounds of down pressure. For example: Lavina 25 Pro, Lavina 25N Pro, 
Lavina 32 Pro by Superabrasive, Inc. 

 
B.

 

Dust extraction system for above grinders incorporating HEPA filter(s) 
capable of containing airborne dust. 

 

C.

 

Hand or edge grinders with dust extraction or dust suppression attachment. 

 

Summary of Contents for InovaCrete

Page 1: ...ete Institute ACI 1 ACI 117 Standard Specifications for Tolerances for Concrete Construction and Materials American Concrete Institute 2 ACI 301 Specifications for Structural Concrete for Buildings Am...

Page 2: ...s D Samples Prior to commencement of work provide 10 x 10 finished samples for the Owner s review See 1 06 Mock Up E Provide maintenance procedures for the polished concrete floor to the Owner s Repr...

Page 3: ...de an open and uninhibited concrete slab B Any anchoring bolts cut off conduit and other associated items removed in a demolition process need to be removed or recessed a minimum of below lowest surro...

Page 4: ...s placed for installation of sample it must meet the same specification as the project s flatwork requirements for the polished concrete floor areas B Equipment tooling and products used are to be the...

Page 5: ...a Overall Ff 40 b Local Ff 20 c Overall FL not required d Local FL not required 2 Tight Hard Troweled three passes concrete No burn marks Reference ACI 302 1R class 5 or class 6 floor 3 Curing Option...

Page 6: ...aFlex I SLX 100 Oil repellent sealer by Prosoco J Ameripolish Decorative Dyes by American Decorative Concrete K Prosoco LS Guard Lavina SPS Floor Glow by Prosoco PART 3 EXECUTION 3 01 EXAMINATION A Ve...

Page 7: ...Calibra Ceramic bonded diamond until a uniform scratch pattern is achieved Vacuum the floor thoroughly using squeegee vacuum attachment 4 Continue the process with 100 grit Calibra Ceramic bonded diam...

Page 8: ...mage dust and spatter related to the work of this section 1 Repair damage caused by the work of this section 2 Clean dust and spatter from adjoining surfaces C Advise all contractors vendors and other...

Reviews: