SECTION 03 35 43                                                                 Updated April 6, 2011 

 

D.

 

Grinding tools by Superabrasive, Inc. 
1.

 

Quick Change Metal bonded diamonds: 30, 50, 70, 120 grits 

2.

 

Calibra Ceramic bonded diamonds: 30, 50, 100, 200 grits 

3.

 

V-Harr

®

 Resin bonded diamonds: 120, 220, 400, 800, 1800, 3500, 8500 

grits 

 

E.

 

High speed burnisher – minimum 27 inch head generating 2,200 rpm or 
greater. 

 

F.

 

V-Harr

®

 Diamond impregnated burnishing pads by Superabrasive, Inc. 

 

G.

 

Penetrating liquid hardener/densifiers such as Prosoco LS/CS Lithium 
Densifier/Lavina SPS Premium Densifier by Prosoco. 

 

H.

 

SL/85 polyurea polymer, semi-rigid joint filler by VersaFlex. 

 
I.

 

SLX 100 Oil repellent sealer by Prosoco. 

 
J.

 

Ameripolish Decorative Dyes by American Decorative Concrete. 

 
K.

 

Prosoco LS Guard/Lavina SPS Floor Glow by Prosoco. 

 
 

PART 3 EXECUTION 
 
 
3.01

 

EXAMINATION 
 

A.

 

Verification of Conditions: Examine surfaces scheduled to receive the work of 
this section for defects that will adversely affect the execution and quality of 
the work. Do not proceed until unsatisfactory conditions are corrected.  
Provide in writing to Owner a list of the conditions. 

 
B.

 

New Concrete: Confirm that a minimum of 28 days has elapsed before 
installation can begin.  Also confirm if curing agents or hardening agents have 
been applied. 

 
 
3.02

 

PREPARATION 

 

A.

 

Cleaning and preparation: 
1.

 

Remove paint droppings by scraping, solvent stripper, and damp cloth.  
Do not use stripper with acidic pH. 

Summary of Contents for InovaCrete

Page 1: ...ete Institute ACI 1 ACI 117 Standard Specifications for Tolerances for Concrete Construction and Materials American Concrete Institute 2 ACI 301 Specifications for Structural Concrete for Buildings Am...

Page 2: ...s D Samples Prior to commencement of work provide 10 x 10 finished samples for the Owner s review See 1 06 Mock Up E Provide maintenance procedures for the polished concrete floor to the Owner s Repr...

Page 3: ...de an open and uninhibited concrete slab B Any anchoring bolts cut off conduit and other associated items removed in a demolition process need to be removed or recessed a minimum of below lowest surro...

Page 4: ...s placed for installation of sample it must meet the same specification as the project s flatwork requirements for the polished concrete floor areas B Equipment tooling and products used are to be the...

Page 5: ...a Overall Ff 40 b Local Ff 20 c Overall FL not required d Local FL not required 2 Tight Hard Troweled three passes concrete No burn marks Reference ACI 302 1R class 5 or class 6 floor 3 Curing Option...

Page 6: ...aFlex I SLX 100 Oil repellent sealer by Prosoco J Ameripolish Decorative Dyes by American Decorative Concrete K Prosoco LS Guard Lavina SPS Floor Glow by Prosoco PART 3 EXECUTION 3 01 EXAMINATION A Ve...

Page 7: ...Calibra Ceramic bonded diamond until a uniform scratch pattern is achieved Vacuum the floor thoroughly using squeegee vacuum attachment 4 Continue the process with 100 grit Calibra Ceramic bonded diam...

Page 8: ...mage dust and spatter related to the work of this section 1 Repair damage caused by the work of this section 2 Clean dust and spatter from adjoining surfaces C Advise all contractors vendors and other...

Reviews: