SECTION 03 35 43 Updated April 6, 2011
11.
Polished floor surface finish edges by stationary objects including interior
partition walls need to be addressed in accordance with the specified notes
on the finish schedule.
3.04
CLEANUP
A.
Dispose of used materials in accordance with local regulations. Concrete dust
collected from the installation of the system shall be the responsibility of the
originator of the work.
3.05
PROTECTION
A.
Keep premises clean and free of debris.
B.
Protect adjoining surfaces from damage, dust and spatter related to the work
of this section.
1.
Repair damage caused by the work of this section.
2.
Clean dust and spatter from adjoining surfaces.
C.
Advise all contractors, vendors and others working in the areas completed that
the concrete slab surface is the finished floor and is to be protected
accordingly as in Section 1.05 F.
D.
Protect floors from damage until Grand Opening. Use of plastic sheeting is
not permitted.
E.
Follow system manufacturer’s instruction for cleaning to ensure proper
protection from dirt and debris.
3.06
INSPECTION
A.
Request acceptance by Owner’s Representative for the finished floor.
B.
Correct all unacceptable work to the satisfaction of the Owner’s
Representative.
END OF SECTION