LT2-F Assembly Manual
SuperDroid Robots, Inc
Contact
224 Technology Park Lane
(919) 557-9162
Fuquay Varina, NC 27526
SDR@SDRobots.com
www.SuperDroidRobots.com
Revised: June 19, 2018
Page 16 of 25
Wrap the #35 chain around the sprockets and cut to length. There is adjustment in the axle slots and in
the motor slots. Cut the chain to length and Install the master link.
Use two bronze bearings for spacing and slide the idler wheel onto the shaft.
Slide a lock collar onto the shaft and then insert the long key into the outside slot.