INSTALLATION
Preparation
Most vacuum system designs are laid out on a clean blank sheet of paper. Unfortunately, typical construction
does not permit this unimpeded access and therefore some planning and preparation early in the project will
save much time and effort later on.
Start by reviewing the installation procedure. Examine where the equipment will be installed and how it will be
supported. Please pay special attention to any objects that might be in the way or in close proximity to the
heating system. Refer to Table A (Clearance to Combustibles) to ensure a safe distance between the heating
system and any combustible materials.
Acquaint yourself with the standard components referred to in this manual. Many of these components are
shown in detail in Figure 3. They are also shown in general assembly form in Figure 1 and Figure 2 to illustrate
where the components fit in a typical symmetrical system and a non-symmetrical system.
(These Figures are
found in the Equipment Specifications section.)
If possible, lay the entire system out on the floor prior to installation. This will help identify any potential
problems with the installation as well as any discrepancy in component quantity. Ensure that all Burners are
those specified for the planned system in both output and gas type.
*DO NOT TRIM / CUT ANY Combustion Tube, adjust the System to fit around the Combustion Tubes.
Layout Limits
Ensure that the System Layout meets the limits required in Table B and
Table C for the Burner Rate you intend the System to function at.
Table B : Radiant Tube System Layout Limits
*
When minimum Radiant Tube lengths are used, minimum tailpipe length must be increased by 50%
Minimum Recommended Maximum Before
Burner After
Burner
120
000
30
(9.2)
40
(12.2)
45
(13.7)
3
(0.9)
15
(4.6)
130
000
35
(10.7)
40
(12.2)
55
(16.8)
3
(0.9)
20
(6.1)
150
000
40
(12.2)
50
(15.3)
60
(18.3)
3
(0.9)
20
(6.1)
165
000
45
(13.7)
50
(15.3)
65
(19.8)
3
(0.9)
20
(6.1)
175
000
45
(13.7)
50
(15.3)
65
(19.8)
3
(0.9)
20
(6.1)
200
000
50
(15.3)
60
(18.3)
70
(21.4)
3
(0.9)
25
(7.7)
225
000
50
(15.3)
60
(18.3)
70
(21.4)
3
(0.9)
25
(7.7)
250
000
55
(16.8)
70
(21.4)
75
(22.9)
3
(0.9)
25
(7.7)
Burner
Rating
[BTU/hr]
Radiant
Tube
Lengths
(Distance
between
Burners)
[ft
(m)]
Minimum
Distance
to
Elbow
[ft
(m)]