6-2
S
UPER
S
TORAGE
S
YSTEM 6028R-E1CR12L User's Manual
Figure 6-1. Front and Rear Chassis Views
6-2 Control Panel
The control panel (located on the front of the chassis) must be connected to the
JF1 connector on the serverboard to provide you with system status indications. A
ribbon cable has bundled these wires together to simplify the connection. Connect
the cable from JF1 on the serverboard to the Control Panel PCB (printed circuit
board). Make sure the red wire plugs into pin 1 on both connectors. Pull all excess
cabling out of the airflow path. The LEDs inform you of system status.
See Chapter 3 for details on the LEDs and the control panel buttons. Details on
JF1 can be found in Chapter 5.
6-3 Accessing the Inside of the Chassis
Some maintenance will require accessing the inside of the server.
Removing the Chassis Cover (Figure 6-2)
1. Remove the two screws from the sides of the chassis cover.
2. Press both release tabs at the same time to unlock the cover.
3. Slide the cover toward the rear of the chassis.
4. Lift the cover off the chassis.
Control Panel
SATA Drives (12)
1
0
9
8
7
6
5
4
3
2
10
11
Note:
numbers above indicate the logical drive locations (drive map).
Power Supplies
5 Low-profile PCI Slots
JBOD Expansion Port
I/O Ports
2x Optional Hot-Swap 2.5" Drive Bays
Summary of Contents for 6028R-E1CR12L
Page 1: ...SUPER STORAGE SYSTEM 6028R E1CR12L USER S MANUAL 1 0a ...
Page 5: ...Notes Preface v ...
Page 14: ...1 6 SUPERSTORAGESYSTEM 6028R E1CR12L User s Manual Notes ...
Page 22: ...2 8 SUPERSTORAGESYSTEM 6028R E1CR12L User s Manual Notes ...
Page 26: ...3 4 SUPERSTORAGESYSTEM 6028R E1CR12L User s Manual Notes ...
Page 86: ...6 12 SUPERSTORAGESYSTEM 6028R E1CR12L User s Manual Notes ...
Page 134: ...7 48 SUPERSTORAGESYSTEM 6028R E1CR12L User s Manual Notes ...
Page 136: ...A 2 SUPERSTORAGESYSTEM 6028R E1CR12L User s Manual Notes ...
Page 140: ...B 4 SUPERSTORAGESYSTEM 6028R E1CR12L User s Manual Notes ...