A+ Server AS -4124GO-NART/AS -4124GO-NART+ User's Manual
24
2.3 Installing the Rails
There are a variety of rack units on the market, which may require a slightly different assembly
procedure.
This rail set fits a rack between 28" and 33.5" deep. Do not use a two post "telco"
type rack.
The following is a basic guideline for installing the system into a rack with the rack mounting
hardware provided. You should also refer to the installation instructions that came with the
specific rack you are using.
Installing the Rails onto a Rack
1.
Identify the left rail and right rail, as they are different.
Figure 2-1. Identifying the Left and Right Rail
2. Position the template at the front of the rack to determine the locations of the screws for
the rails.
Left
Right
Figure 2-2. Placing Template in Rack
Summary of Contents for A+
Page 1: ...USER S MANUAL Revision 1 0b A Server AS 4124GO NART AS 4124GO NART ...
Page 14: ...14 A Server AS 4124GO NART AS 4124GO NART User s Manual Figure 1 6 Motherboard Block Diagram ...
Page 95: ...Chapter 4 UEFI BIOS 95 Save Changes and Exit Use this item to save the changes above and exit ...