6-1
Chapter 6: Rack Installation
Chapter 6
Rack Installation
6-1 Overview
This chapter provides a quick setup checklist to get your chassis up and running. Following
these steps in the order given should enable you to have the system operational within a
minimum amount of time.
6-2 Unpacking the System
You should inspect the box the chassis was shipped in and note if it was damaged in any
way. If the chassis itself shows damage you should file a damage claim with the carrier who
delivered it.
6-3 Preparing for Setup
The box your chassis was shipped in should include two sets of rail assemblies, two rail
mounting brackets and the mounting screws you will need to install the system into the rack.
Please read this section in its entirety before you begin the installation procedure outlined in
the sections that follow.
Decide on a suitable location for the rack unit that will hold your chassis. It should be situated
in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise and
electromagnetic fields are generated. You will also need it placed near a grounded power
outlet. Be sure to read the Rack and Server Precautions in the next section.
Choosing a Setup Location
•
Leave enough clearance in front of the rack to enable you to open the front door completely
(~25 inches).
•
Leave approximately 30 inches of clearance in the back of the rack to allow for sufficient
airflow and ease in servicing.
•
This product is for installation only in a Restricted Access Location (dedicated equipment
rooms, service closets and the like).