6-7
Chapter 6 Rack Installation
Figure 6-5: Installing the Rack Rails
Installing the Chassis into a Rack
Rack Installation
Confirm that chassis includes the inner rails (A) and rail extensions (B). Also,
1.
confirm that the outer rails (C) are installed on the rack.
Align the chassis rails extentions (B), with the front of the rack rails (C).
2.
Slide the chassis rail extensions into the rack rails, keeping the pressure even
3.
on both sides (you may have to depress the locking tabs when inserting).
When the server has been pushed completely into the rack, you should hear
the locking tabs "click" into position.
(Optional) Insert and tightening the thumbscrews that hold the front of the
4.
server to the rack.
C
A
B
Summary of Contents for SC809T-780B
Page 1: ...SC809 Chassis Series USER S MANUAL 1 0a SC809LT 780B SC809T 780B SC809T 980B SUPER ...
Page 8: ...SC809 Chassis Manual viii Notes ...
Page 12: ...SC809 Chassis Manual 1 4 Notes ...
Page 34: ...SC809 Chassis Manual 5 12 Figure 5 10 System Fan Placement 6 7 ...
Page 44: ...SC809 Chassis Manual 6 8 Notes ...
Page 50: ...SC809 Chassis Manual B 2 Notes ...
Page 59: ...C 9 Appendix C SAS 809T TQ Backplane Specifications Notes ...