3-5
Chapter 3: Setup and Installation
6.
With one person on either side (see the descriptive label on the side of the
enclosure), lift the enclosure and slide it into the installed rails.
7.
After pushing the enclosure all the way into the rack, use two roundhead screws on
each side of the server to lock it into place.
Figure 3-3. Attaching the Optional Handles
8.
The enclosure is now securely installed in the rack (see
Figure 3-4
).
NOTE:
These handles are optional and need only be installed when mounting
the system into a short rack. When mounting into a deep rack, they are
unnecessary and regular screws should be used instead of thumbscrews.
Be aware that these handles are not to be used for lifting the system, they
are only to be used to slide the system within the rack.
WARNING:
Be sure that the enclosure is empty of all blades, power supplies,
switches and management modules
BEFORE
lifting. These should be installed
AFTER
the enclosure is mounted in the rack. Injury and damage may occur if
components are not removed from the rack prior to installation.
Summary of Contents for SuperBlade Series
Page 1: ...SuperBlade User s Manual Revison 1 0c...
Page 4: ...SuperBlade User s Manual iv Notes...
Page 8: ...SuperBlade User s Manual viii Notes...
Page 10: ...SuperBlade User s Manual x Notes...
Page 12: ...SuperBlade User s Manual xii Notes...
Page 22: ...SuperBlade User s Manual 1 10 Notes...
Page 30: ...SuperBlade User s Manual 3 6 Figure 3 4 Enclosure Installed into Rack...
Page 53: ...5 7 Chapter 5 Power Supply Modules Figure 5 6 Power Cable Tie and Clamp Assembly...
Page 54: ...SuperBlade User s Manual 5 8 Notes...
Page 58: ...SuperBlade User s Manual A 4 Notes...