2-1
Chapter 2: System Safety
Chapter 2
System Safety
2-1 Overview
This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in order given should enable you to have your chassis set up
and operational within a minimal amount of time. This quick setup assumes that you
are an experienced technician, famailiar with common concepts and terminology.
2-2 Warnings and Precautions
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well venilated. Avoid areas where heat,
electrical noise and eletromagnetic fields are generated.
The chassis must be placed near at least one grounded power outlet. When con-
figured, the SC933 chassis includes three redundant power supplies and requires
three grounded outlets.
2-3 Preparing for Setup
The SC933 chassis includes a set of rail assemblies, including mounting brackets
and mounting screws you will need to install the system into the rack. Please read
this manual in its entirety before beginning the installation procedure.