background image

© 2020

Order #56343

DO NOT USE POWER TOOLS

ALL CONNECTIONS MUST

BE TIGHTLY SECURED

Part Identification - Numbering

Spline Connection

Base Plate & Extrusion Connection

General Setup Instructions

- Read entire setup instruction manual prior to 

  unpacking parts and pieces. 

- The setup instructions are created specifically 

  for this configuration.

- Setup instructions are laid out sequentially in

  steps, including exploded views with detailed 

  explanation for assembly.

WARNING

Cleaning & Packing

- For Cleaning Metal, Plex, & Laminate Parts: 

  Use a 

MILD NON-ABRASIVE

 cleanser and 

  soft cloth/paper towel to clean all surfaces. 

- Keep exhibit components away from heat 

  and prolonged sun exposure.

  

Heat and UV exposure will warp and 

  fade components. 

- Retain all provided Packing Materials.

  All provided packing materials are for 

  ease of repacking & component protection.

Disassembly

- For loss prevention, tighten all set screws 

  and locks during disassembly.

7A

Hex Tool - Essential for Assembly

Extrusion & Lock Connection

Engaged Lock

LADDERS OR LIFTS 

MAY BE REQUIRED

General Information

Summary of Contents for VK-0004

Page 1: ...2020 Order 56343 Top View Perspective View VK 0004 Supernova If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP INSTRUCTIONS ...

Page 2: ...ailed explanation for assembly WARNING Cleaning Packing For Cleaning Metal Plex Laminate Parts Use a MILD NON ABRASIVE cleanser and soft cloth paper towel to clean all surfaces Keep exhibit components away from heat and prolonged sun exposure Heat and UV exposure will warp and fade components Retain all provided Packing Materials All provided packing materials are for ease of repacking component p...

Page 3: ...o channels Allows for proportional fit around the perimeter of the extrusion 3 Working from center to corner slide silicon edge on graphic into channel 4 After all edges of graphic have been inserted into channels step back and assess graphic fit make adjustments where needed 4 1 3 2 Fold edges over Insert into groove of frame SEG Installation ...

Page 4: ... connectors 1 Place extrusions end to end 2 Loosen all knobs then slide straight connectors across the seam of extrusions Disassembly 1 Loosen all knobs 2 Slide connectors off of one extrusion 3 Tighten knobs to prevent loss during packing shipping CEI110 Profile Slide both connectors across seam of extrusions Tighten all knobs Corner Connection 3 Tighten all knobs to secure connection Disassembly...

Page 5: ... 2020 Case 1 of 1 Order 56343 3 1 1A 2 2A 4A 4A 4 4 Graphics Setup Hardware Top View of Each Level Level 1 Bottom Level Level 2 Level 3 Infill Infill Infill 5 5 Case Packing ...

Page 6: ... base plate 6A to vertical 3 using M8 bolt Note Base plate 6A stays attached to 3 when packing 3 Connect horizontals 4 and 5 to vertical 2A Tighten locks to secure 4 Insert Infills between horizontals 4 and 5 then secure with vertical 3 5 Connect lighting power cords and attach transformer See Light Connection details 6 Apply SEG graphic to front and blocker fabric to back of assembled Light Box S...

Reviews: