SC747 Chassis Manual
6-2
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to
•
the floor with the full weight of the rack resting on them.
In single rack installation, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure the rack is stable before extending a component from the
•
rack.
You should extend only one component at a time - extending two or more si-
•
multaneously may cause the rack to become unstable.
General Server Precautions
Review the electrical and general safety precautions that came with the com-
•
ponents you are adding to your chassis.
Determine the placement of each component in the rack
•
before
you install the
rails.
Install the heaviest server components on the bottom of the rack first, and then
•
work up.
Use a regulating uninterruptible power supply (UPS) to protect the server from
•
power surges, voltage spikes and to keep your system operating in case of a
power failure.
Allow the hot plug hard drives and power supply modules to cool before touch-
•
ing them.
Always keep the rack's front door and all panels and components on the servers
•
closed when not servicing to maintain proper cooling.
Warnings and Precautions!
!
!
Summary of Contents for SC747TQ-R1400B
Page 1: ...SC747TQ R1400B USER S MANUAL 1 0 SC747 CHASSIS Series SUPER...
Page 8: ...SC747 Chassis Manual viii Notes...
Page 12: ...SC747 Chassis Manual 1 4 Notes...
Page 50: ...SC747 Chassis Manual 5 28 Notes...
Page 62: ...SC747 Chassis Manual 6 12 Notes...
Page 66: ...SC747 Chassis Manual A 4 Notes...
Page 68: ...SC747 Chassis Manual B 2 Notes...
Page 79: ...C 11 SAS 747TQ Backplane Specitications Notes...