6-3
Chapter 6: Rack Installation
General Server Precautions
•
Review the electrical and general safety precautions that came with the com-
ponents you are adding to your chassis.
•
Determine the placement of each component in the rack.
•
Install the heaviest server components on the bottom of the rack first, and then
work up.
•
Use a regulating, uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
•
Allow the hard drives and power supply modules to cool before touching them.
•
Always keep the rack front door, all panels and all components on the servers
closed when not servicing, to maintain proper cooling.
Summary of Contents for SC827HD-R1400B
Page 1: ...SC827HD Chassis Series USER S MANUAL 1 0 SUPER SC827HD R1400B SC827HD R1620B...
Page 12: ...SC827HD Chassis Manual 1 4 Notes...
Page 32: ...2 20 SC827HD Chasssis Manual Notes...
Page 38: ...SC827HD Chassis Manual 4 4 Notes...
Page 68: ...SC827HD Chassis Manual 6 10 Notes...
Page 70: ...SC827HD Chassis Manual A 2 Notes...
Page 72: ...SC827HD Chassis Manual B 2 Notes...
Page 81: ...C 9 Appendix C Backplane Notes...