2-6
S
UPER
S
ERVER 5015B-UR/5015B-U/5015B-NTR/5015B-NT User's Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click".
Summary of Contents for Supero SUPERSERVER 5015B-NT
Page 5: ...v Preface Notes ...
Page 67: ...Chapter 6 Advanced Chassis Setup 6 11 Figure 6 6 Removing Replacing the Power Supply ...
Page 68: ...6 12 SUPERSERVER 5015B UR 5015B U 5015B NTR 5015B NT User s Manual Notes ...
Page 92: ...A 2 SUPERSERVER 5015B UR 5015B U 5015B NTR 5015B NT User s Manual Notes ...
Page 98: ...C 4 SUPERSERVER 5015B UR 5015B U 5015B NTR 5015B NT User s Manual Notes ...