5-2
S
UPERSERVER 6012L-6 User’s Manual
IMPORTANT: Always connect the power cord last and always remove it
before adding, removing or changing any hardware components. Make
sure that you install the processor into the CPU socket before you install
the heatsink. The P4DLR+ can support either one or two Intel Xeon 512K L2
cache processors of 2.4+ GHz. If installing one processor only, install it
into CPU socket #1.
!
5-2
PGA Processor and Heatsink Installation
When handling the processor package, avoid placing direct
pressure on the label area of the fan. Also, do not place the
motherboard on a conductive surface, which can damage the
BIOS battery and prevent the system from booting up.
1. Lift the lever on the CPU socket.
Lift the lever completely or you will
damage the CPU socket when
power is applied. (Install a
processor into CPU #1 socket
first.)
Socket lever
2. Install the CPU in the socket.
Make sure that pin 1 of the CPU is
seated on pin 1 of the socket (both
corners are marked with a
triangle). When using only one
CPU, install it into CPU socket #1
(CPU socket #2 is automatically
disabled if only one CPU is used).
Pin 1
3. Press the lever down until you
hear it *click* into the locked
position. See Figure 5-1 for
pictures of the 603-pin CPU socket
before and after the processor is
installed.
Socket lever in
locked position
Summary of Contents for SUPERSERVER 6012L-6
Page 1: ...SUPERSERVER 6012L 6 USER SMANUAL 1 0a SUPER...
Page 5: ...v Preface Notes...
Page 10: ...Notes SUPERSERVER 6012L 6 User s Manual x...
Page 26: ...2 10 SUPERSERVER 6012L 6 Manual Notes...
Page 38: ...5 4 SUPERSERVER 6012L 6 User s Manual Figure 5 2 Heatsink Installation...
Page 60: ...5 26 SUPERSERVER 6012L 6 User s Manual Notes...
Page 69: ...Chapter 6 Advanced Chassis Setup 6 9 Figure 6 5 Removing Replacing the Power Supply...
Page 70: ...6 10 SUPERSERVER 6012L 6 Manual Notes...
Page 98: ...A 2 SUPERSERVER 6012L 6 Manual Notes...