S
UPER
S
ERVER 6113L-8/6113L-i User's Manual
2-4
Figure 2-1. Installing the Rack Rails
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack
unit. The next step is to install the server into the rack. Do this by
lining up the rear of the chassis rails with the front of the rack rails.
Slide the chassis rails into the rack rails, keeping the pressure even on
both sides (you may have to depress the locking tabs when inserting).
See Figure 2-2.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that
hold the front of the server to the rack.
Summary of Contents for SUPERSERVER 6113L-8
Page 1: ... SUPERSERVER 6113L 8 SUPERSERVER 6113L i USER S MANUAL 1 0 SUPER ...
Page 5: ...v Preface Notes ...
Page 10: ...SUPERSERVER 6113L 8 6113L i User s Manual x Notes ...
Page 18: ...SUPERSERVER 6113L 8 6113L i User s Manual 1 8 Notes ...
Page 28: ...SUPERSERVER 6113L 8 6113L i User s Manual 2 10 Notes ...
Page 32: ...SUPERSERVER 6113L 8 6113L i User s Manual 3 4 Notes ...
Page 72: ...6 10 SUPERSERVER 6113L 8 6113L i User s Manual Figure 6 6 Removing Replacing the Power Supply ...