S
UPER
S
ERVER 6113L-8/6113L-i User's Manual
5-6
4. Repeat steps 1 and 2 to install a second power pod as needed.
Securing the power pod with four M3 screws.
3. Locate four of the M3 screws in the heatsink retention package and use them
to secure the power pod onto the serverboard as shown in the picture below.
Figure 5-2. Dual Itanium2 CPUs with Power Pods Installed
Summary of Contents for SUPERSERVER 6113L-8
Page 1: ... SUPERSERVER 6113L 8 SUPERSERVER 6113L i USER S MANUAL 1 0 SUPER ...
Page 5: ...v Preface Notes ...
Page 10: ...SUPERSERVER 6113L 8 6113L i User s Manual x Notes ...
Page 18: ...SUPERSERVER 6113L 8 6113L i User s Manual 1 8 Notes ...
Page 28: ...SUPERSERVER 6113L 8 6113L i User s Manual 2 10 Notes ...
Page 32: ...SUPERSERVER 6113L 8 6113L i User s Manual 3 4 Notes ...
Page 72: ...6 10 SUPERSERVER 6113L 8 6113L i User s Manual Figure 6 6 Removing Replacing the Power Supply ...