background image

Installation Instructions - #SS401/SS500 

Rear Trac Bar

Installation of the Frame Bracket B-754 and Pinch Plate B-753

 Install the frame bracket B-754 and pinch plate B-753 on the frame rail.  The frame must be between the 

pinch plate and the frame bracket.  The frame bracket is designed to mount to the bottom and sides of 

the frame rail. Position the frame bracket below the frame rail on the passenger side in line with the axle 

bracket.

Align slotted holes in frame bracket with threaded holes in pinch plate. (Place the nut plate with lip facing 

down and towards center of vehicle).  Install (2) 5/8”x2” fine threaded bolts, (2) 5/8” lock washers & (2) 

5/8” flat washers. (Use blue Loctite and tighten “just snug” for now)

Note:

 Make sure not to contact any wires, brake lines, etc. This kit also includes zip 

ties and flexible plastic conduit should coach wiring needs to be moved or shielded.

Use the Trac Bar to check alignment from differential plate to frame bracket. Adjust forward or back. Then 

install the jam nuts onto the ½” fine threaded bolts and install in the frame bracket.  Tighten to push the 

nut plate against the inside of the frame, then tighten the bottom bolts securely. Now tighten the jam nuts 

against the bracket to lock the ½” fine threaded bolts into place and keep it from backing out. 

Installation of Rod Assembly  (SS401-1)

Note:

  The rod assembly may be installed on the front or back of the brackets to 

achieve best clearance. 

Install the rod assembly with the ¾” x 3” bolts, flat washers and lock-nuts.  Be sure that there is a flat 

washer on both sides of the urethane bushings of the rod end.  When adjusting the length of the rod, it is 

necessary that the coach’s full weight be on the suspension.  

Torque all the standard ½” bolts on the Differential Bracket to 120 ft. lbs.  If a Dana 110, 130, or 150 mod

-

el with metric bolts, torque to 142 - 158 ft. lbs. Be sure to check all fasteners for tightness, including the 

jam nut on the rod assembly. Torque the ¾” rod end bolt to 150 – 180 ft. lbs. Torque the jam nut to 100 - 

150 ft. lbs.  This completes the installation.

 

Test drive.

To register your product for warranty purposes, go to the SuperSteer website at 

www.SuperSteerParts.com 

and fill out the online registration card

 

Re-check torque in 6 months.

Reviews: